PROJECTS → FODD
FLUSHING THE CONDENSER OF A CENTRIFUGAL CHILLER – GF2
INDUSTRY
Food.
DURATION
3 days.
EQUIPMENT
Centrifugal chiller.
MATERIAL
Copper (spiral pipes).
PROBLEM
Persistence of diffuse and discontinuous carbonate scaling.
Very hard “limescale” well adhered to the internal spiral of the tubes.
SOLUTION
Chemical flushing.
SERVICE
ENERGY
TL31 condenser corrosion treatment →
Alternator turbine oil cooling plate lining →
Evaporative tower lining →
Drinking water tank lining →
Sealing and waterproofing of tank berm →
Centrifugal chiller flushing and ND testing →
PETROCHEMICAL
PRS sealing and reinforcement of fractionating column line →
Heat exchanger internal pipe and tube plate lining →
Structural reinforcement with PRS carbon fibre wrapping →
Anti-corrosion treatment of a condenser →
REFINING
Air cooler inlet and plate lining→
Torch network vessel interior lining →
FOOD
Olive pomace oil hexane vessel interior lining →
Condenser chemical flushing →
NUCLEAR
Condenser flushing →
Steam turbine condenser plate lining →
DEPOSIT AND STORAGE
Leak repair and PRS flat reinforcements on floating roof membrane →
Storage tank shell and bottom repair →
CONTACT US FOR DETAILS OF OUR SOLUTIONS